Question 18/II - Grade of service during and after a total failure of network components or traffic peak conditions (new Question) Considering (a) that due to accumulated demands during a period of a failure (see Recommendation 550, section 3.1, points a) and b)), the network components will experience a heavy traffic load during and after a failure condition; (b) that depending on daily traffic profile such heavy traffic load may also occur after having removed severe overload condition; (c) that Recommendation E.550 concerning the Grade of Service and new performance criteria only under failure conditions does not cover the period of time immediately after a failure condition or heavy traffic peak have been removed; (d) that in case of lack of facilities for re-routing in the network the whole traffic offered has to be processed, 1. What parameters should be proposed for evaluation of Grade of Service of network components during and after a failure condition or severe overload traffic condition? 2. What is the way of calculating and measuring these parameters? 3. What standards should be proposed for these parameters? Note - Liaison needs to be established with Study Group XI (Working Party XI/4, Digital Switching) with the objective to define techniques for recognizing the condition and regulating the operation of an exchange during excessive traffic peaks.